In this article
The following tasks linked below must be performed if you are upgrading your Forsta Plus installation from a previous version.
Assigning New Task Types to Task System Servers
New versions of Forsta Plus often include new task types, which will need to be assigned to one or more batch servers. This can be done in the Forsta Plus GUI, in the Admin > Batch > Server Configuration menu. If a task is not run on any of the servers, the text for the task will turn red.